
When a 500MW power boiler stops for ten days due to unanticipated trouble, the minimum financial loss would be approximately around $10M. This calculation is based on electric power sold in Southeast Asia.
Babcock-Hitachi's expertise with the design, manufacturing, operation, and maintenance of boilers is utilized to introduce a cost-effective approach to improving plant availability.
This approach has been proven to reduce the rate of unscheduled shutdowns in Japan resulting in the reduction of financial loss and risk of accidents; thus avoids harm to the environment and staff.
Related Links