STRESS RELIEVING SERVICES

     Tubes belonging to P-3 (1/2 Mo, tensile strength greater than 55 kg/mm 2) and above is advisable to undergo post weld heat treatment to:

  • Reduce "locked-in" stresses at the heat-affected zones
  • To reduce distortion during subsequent assembly and installation
  • To enhance corrosion resistance

           The furnace should be of the multiple burners with controls to be able to:

  • Heat the complete assembly as a unit
  • Control the rate of increase/decrease in temperature of the furnace
  • Maintain a relatively uniform temperature inside the furnace (difference in temperature at points 15 feet apart should not be greater than 50 C.

Capacity: 50 Tons

Inside Dimension: 3.9m X 5.5m X 14.875m L